Despite the continuing challenges posed by the Covid-19 pandemic, several projects were completed primarily targeting the improvement of premises and raising of campus standards for the benefit of our students and community.
Annex Outdoor and Playground Area Renovation
Temporary Play Area - Newly Purchased Land
Annex 3rd Floor Electrical Renovation
Annex 3rd Floor Ceiling Repair
Annex 3rd Floor Faculty Workroom
Administration Building Ground Floor Renovation
The ground floor of the Administration Building was redesigned and renovated. A new reception area, meeting room, and a number of offices were part of this upgrade. Additionally a ramp for wheelchair users was constructed in order to improve accessibility to the building.
Germicidal Air Cleaning Devices
Media Studio New Podcast Booth
The new podcast booth is an independent audio production space for 2 people which is acoustically treated and soundproof, located in the production area of the Media Studio. It is used for all interview-style productions of the school and other audio applications.
Building Waterproofing Works
Annex Power Station - Fire detection and Extinguishing System
A new two-zone fire detection and extinguishing system was installed in the Annex electrical substation following the structural upgrade works. In the event of a fire the system provides an audible alarm and automatically activates the extinguishing system. The new system is in line with the latest regulations.
IT & Audio Visual Upgrades
During the year we installed a new IP Telephony System school wide (Cisco Call Manager) replacing our old system, we installed 35 Cisco High Density Access points rearranging the distribution pattern in order to increase the WiFi capacity and we replaced about 60 laptops, 30 classroom projectors, 20 interactive boards, and 15 desktop computers. Furthermore, we doubled our Internet bandwidth and installed an additional FireWall protection.
Shatter Resistant Window Films
As part of our Safety and Security Master Plan, we have commenced the installation of shatter resistant window films on all the windows of our buildings. We have selected the Ultra S800 film type of the well known company 3M, which is a micro layered film composite for enhanced protection of people and property. It has excellent characteristics for glass fragment retention and protection over flying glass shards.
The project is granted by the US Embassy, it is in the initiation phase and is expected to be completed until May of 2022.
New Public Address System
We commenced a project for the installation of a new public address system. The new PA System is based on a solution by Bosch, PRAESENSA. It provides high-quality audio for music or messaging to every area in our campus buildings. It is controlled via the intuitive graphical user interface on the call station touch screen, or via personalized software running on a tablet or PC. Fully IP-based and fully-featured, this is a state-of-the-art Public Address and Voice Alarm system has built-in redundancy and active self test.
The project is granted by the US Embassy, it is in the initiation phase and is expected to be completed until May of 2022.
Appreciation to Donors and Maintenance department
We would like to sincerely thank our school’s Capital Project donors for their time, effort and provided funds. They assisted in purchasing various IT/AV Equipment, furniture for the Administration Building, Air Purifiers, our new Public Address System and the Shatter Resistant Window Films.
Also, we would like to thank our school’s maintenance team for their tireless support and continuing dedication to 香港六合彩开奖结果2023 vision, which allowed us to complete the projects timely despite the very challenging pandemic conditions.